Send Message
Home ProductsCold Drawing Machine

Pickling Process Before Cold Drawing

I'm Online Chat Now

Pickling Process Before Cold Drawing

Pickling Process Before Cold Drawing
Pickling Process Before Cold Drawing
Pickling Process Before Cold Drawing Pickling Process Before Cold Drawing

Large Image :  Pickling Process Before Cold Drawing

Product Details:
Place of Origin: China
Brand Name: EOOE Hydraulic
Certification: ISO9001
Model Number: 2000KN
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiable
Packaging Details: Plastic Wrap+vacuum packing+iron frame
Delivery Time: 4-5Month
Payment Terms: L/C, T/T
Supply Ability: 100 Sets/Year

Pickling Process Before Cold Drawing

Description
Feature: Advanced Hydraulic System Maximum Return Speed Raw Material: ≤14m/min
Rated Working Pressure: 250 Bar Loading Capacity: 3t
Warranty: 365 Days Design: Custom
Hydraulic Oil Tank Capacity: 4000L ID Of Main Cylinder: 350mm
High Light:

Cold Drawing Pickling Process

,

Pickling Process Cold Drawing

 

Ⅰ. Brief Introduction

 

After hot rolling or heat treatment, the steel has a thick layer of iron oxide covering the surface of the steel. Before cold drawing steel, it is necessary to remove this layer of oxide scale to ensure the quality of the cold drawn steel. The iron oxide scale on the surface of steel affects lubrication (for example, during phosphating and saponification, the presence of iron oxide scale can directly affect the precipitation of phosphate and cannot firmly bond with the substrate of steel); On the other hand, during cold drawing, due to the high hardness of the oxide scale, it is easy to cause surface defects such as scratches on the steel surface. At the same time, it can also increase the drawing force and intensify mold wear, resulting in difficulties in drawing and failing to meet the requirements for a smooth surface of cold drawn steel. Removing iron oxide scale during production also facilitates the detection of defects on the surface of steel for cleaning purposes. Therefore, sufficient attention must be paid to the removal of iron oxide scale in the production of cold drawn steel.

 

At present, the main method for removing iron oxide scale in the production of cold drawn steel is acid washing. Sometimes non acid washing methods are used in production, but only for pre-treatment. The final and most thorough method is to remove the oxide scale through acid washing.

 

 

Ⅱ. Customer Case 

 

                                            Main Parameters of YLB-A-200-12/5
Machining Raw Material

SS304,SS316,SS321 Stainless Steel Tube

Raw Material Wall Thickness  10
Raw Material Length Range 7M

 

 

Ⅲ. Picture

 

Pickling Process Before Cold Drawing 0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact Details
EOOE Hydraulic Co.,Ltd

Contact Person: Ms. Patricia

Tel: +86 19802501087

Send your inquiry directly to us (0 / 3000)